109 Taoyuan City Soil and Groundwater pollution survey and inverstigation plan
Absrtact |
The work content of this project includes: implementation of verification operations after the improvement of Taoyuan market site, groundwater monitoring of the early warning network in the industrial zone, inspection and maintenance of monitoring wells, inspection of the pipeline site, regular site monitoring, site inspection supervision, and emergency response to public complaints Work, regulation promotion meeting and related administrative assistance. Completed (1) According to the supplementary requirements of the public bidding guidelines, the successful bidder shall submit the "Entrusted Plan Quality Assurance Plan" to the Environmental Protection Agency of the Executive Yuan for review within 15 days after the bid is awarded, and on March 4 Nuclear preparation. (2) Investigation and verification, verification of factory-type polluted sites, the contract is scheduled to be implemented on 7 sites, and currently 12 sites are implemented (10 sites are supported by emergency response funds). The verification results showed that 1 sites exceeded the control standard (source of pollution unknown), and 11 sites were below the control standard. (3) Early warning network groundwater monitoring, 3 industrial areas (Zhongli, Linkou Gongsan, and Young Lions) 14 sub-monitoring wells sampling operations, of which Taoyuan Young Lions had 2 hypotrichloroethylene exceeding the control standards, and Zhongli had 1 Oral trichloroethylene exceeded the monitoring standard. (4) Inspection of monitoring wells have been completed in the first half of the year for abnormal inspections (signs, stagnant water, covered by asphalt and other situations, replacement of parts, removal of stagnant water, etc. have been completed on site. (5) Regular site monitoring: farmland The site screened 64 farmland monitoring, and each farmland principle inspected 1 group of heavy metal samples (8 items: arsenic, cadmium, chromium, copper, mercury, nickel, lead, zinc) samples. The implementation has been completed, and the monitoring standards should be continuously monitored regularly. The frequency is once every 5 years. In addition, if the monitoring standard is lower than the monitoring standard, regular monitoring can be cancelled. 11 groundwater restricted use areas, complete groundwater sampling operations, can be processed according to trend calculations. Gas station sites are targeted for abnormal underground areas within the jurisdiction. The storage tank system handled 20 stations and 6 soil gas GC analysis. The monitoring results showed that 1 PID exceeded the warning value, and 3 FID exceeded the warning value. The
|
---|---|
Keyword |
Soil & Groundwater, Pollution Investigation, Verification
|